Tuesday, January 31, 2012

-- January end results; plans for February

This is what I finished:

2 Sweaters (one was 99% done before January)
1 pair of gloves
5 hats
1 12" square for a baby blanket
1 scarf
1 small toy Lion

WIPs:

1 Sweater - Cabled Sweater at 33% done
1 Baby Blanket - about 33% done
1 Hat - about 75% done
1 pair of Gloves - about 5% done

Hibernating Projects:

1 overly large toy Alligator (reserving the right to call it a crocodile if the mouth/teeth don't work out)
Lots of Blanket squares to seam together for something
Master Knitter's Program Level 1 swatches

February Plans:
Day one - finish a WIP - since three of the projects will take far too long to finish tomorrow - I might seam some of those squares for the ARL for their cats


Get to 66% done on Cabled Sweater
Get to 50% done on Cabled Gloves
Lia sweater
12 jellyfish hats (< 2 hours each)
Felted Knitted project bag
1 Scarf
1 12" Blanket Square
2-hr Crocheted Baby Blanket

Friday, January 27, 2012

February Sweater Plans

This will be the fourth sweater in the plans -- a photo from the Ravelry project page:



Lia (Rav link) is a bulky weight sweater with mild cabling and a super quick knit. I'm going to use Berroco Weekend Chunky yarn in Starry Night color way (a very pretty dark blue, not quite navy color).

I'm waiting until the first to cast on; am loving it!




On the cabled sweater news front? The ribbing is fun to knit and even though I haven't had a ton of time to work on it, going quite quickly. Last night though, sadly I hit upon a circular needle join failure. It's the first time I've ever had an addi turbo circular needle fail. I was a little shocked because I've had so much success with their needles and it took a few seconds for it to sink in. Thankfully, it's a size 4 which is my most common size to need and I happen to have a second one that was even a) long enough and b) with nothing on the needles... so I quickly picked up the fallen stitches with it; knit off the back end of the needle that had failed and then was able to finish knitting around... so I didn't lose hardly any time.

For the rest of the evening, I kept picking up the broken addi and giving it a dirty look. When I got ready for bed I threw it away in the trashcan; but felt I was missing something... should I have done a ceremonial disposal, I thought? My addi's are my favorite knitting tools. Somehow tossing them into the bin seems inadequate. That needle has worked on so many of my favorite projects.

My original plans were to save up to purchase a set of addi clicks this spring/summer... still debating on buying lace tips or not; now that they are coming out with longer needle lace tips, I was debating those... but now, I'm a little concerned. Are they really worth the extra money like I think they are? Folks say they really like the Knit Picks Options set. I'm not sure I trust them when they say the cables are as flexible as Addi's cables are.... so much to figure out.

-- All Knitting Status

4) As soon as OWL is approved cast on for Cabled Sweater by Bernat - get it to the 40% finished mark and go back and keep working on Pick, Pick, Pick it up Pattern until it's done.Cast-on; sleeves done, cast-on and knit all but a couple of rows of the body... will finish ribbing and set aside until Feb 1.

6) Second portable/simple project - pair of simple, worsted weight gloves - DONE

7) a half-dozen more Brioche Stitch hats (as time permits) - Going to work on this weekend

8) Would also like to find time to do a 12" square for a contribution to a friend's baby blanket. DONE

NEW) Since I finished everything in my target, with the exception of my hats... I've also picked up an old WIP - a baby blanket that is going QUITE SLOW (hence the putting aside). I figure when I get tired of working on hats, I'll work on the blanket. When I get tired of working on the blanket, I'll pick up the hats.

I'm heading to a local Knitting Retreat this weekend, so I should have a TON of knitting/chatting time and both the blanket and the hats are good for chatty knitting time as I can practically do both in my sleep.

Monday, January 23, 2012

Sweater #2 of 12 finished!

The Pick It Up sweater was finished in next to no time (it seemed) once I was done working on the sleeves. But, I guess that's how that pattern would work - since you knit the sleeves first, then stop working in the round - but keep working the same stitches until they meet in the back (which is half of the back). Picking up and working down to the waist from the back of the "shrug" and adding a pretty little cable meant I had some interesting knitting that sped right along. Then there are no fronts "technically" - it's just a garter stitch band around the front.

Unfortunately there aren't very good photos to share. I tried snapping a mirror pic, but it really didn't turn out. And my 8 yr old really doesn't do photos very well.

So here it is on the hanger - front & back:






The color in the progress post is a little more 'true'.

I'm back to work on the cabled sweater and hope to finish the ribbing this week.

Plans are to cast on the next sweater after February First!

Thursday, January 19, 2012

Other than sweaters progress post... forgot I had posted my plans for all knits.

3) Cast-on First sweater - Pick, Pick, Pick it Up pattern (to turn in before the end of January for a class) Cast-on; sleeves finished; getting going on the back - about 50% done

4) As soon as OWL is approved cast on for Cabled Sweater by Bernat - get it to the 40% finished mark and go back and keep working on Pick, Pick, Pick it up Pattern until it's done.Cast-on; sleeves at 18" - still my priority until I get to the ribbing on the body - calling it 25% done

5) Portable/simple project - work on a Brioche Scarf (third class project) - DONE - but need better pics

6) Second portable/simple project - pair of simple, worsted weight gloves - cast-on and am in the thumb gusset increases now.

7) Since I'm being tempted, and the gloves will probably be finished before next weekend; and I need some other fairly simple projects for a Knit-in Weekend; Am probably going to do a half-dozen more Brioche Stitch hats (as time permits)

8) Would also like to find time to do a 12" square for a contribution to a friend's baby blanket.

... I think I need to find a way to learn to knit in my sleep.

Wednesday, January 18, 2012

Photos - for January mid-month progress

Cabled Sweater from Bernat

Shoddy picture first (sorry, didn't realize it was so bad until this morning)... but it shows the length on the two sleeves (and it's more true on the colors than the next shot):



This is a close up of the cables - pre-blocking of course. But if you look at finished photos of the sweater, this doesn't really spread much over what you see here. Loving the braiding; thinking that they made it a little more complicated than it needed to be as you can't really see some of the details that they added that makes it more complicated and a simpler braid would still look fine with two simple twisting cables with a third line coming in.... but I'm following the directions anyway and think blocking will help some of those finer details show up a little better.




Pick It Up Sweater

Again, this was knit cuff-in to the center back (very frustrated with my grafting being too tight - but hopefully the yarn is going to forgive my sins). I've picked up and started knitting down the back. In this first shot (again the best at being color-true) you can see the back and where I'm working on it:



This shows a little more detail on the cabled braid I'm working down the center back. It's a 20 stitch repeat with simple cables that twist around the sides, then back to the center, then out again. I'm really glad I've added this detail. Wasn't sure how well it would show with the yarn; but I love the little bit of added complexity and it really makes for a much more interesting knit.

Tuesday, January 17, 2012

Mid-month Progress

See? I can too put in more than one post in a month. Can't promise to keep it up very many months into the year; but I'm going to shoot for two posts a month to show my progress/lack there of.

Jan 17th - progress to date.

1 sweater out of 12 finished.

Herbology Sweater #2 - (three month expected to complete): I have cast-on and knit the sleeves 2aat; and they are both at the 18" mark. I've managed to try them on as I go and they were starting to get a little snug; but a couple of the increases added a little more quickly fixed that right quick. They fit PERFECTLY. The sleeve cap starts at 18 1/2".... I had one of the sleeves on my arm and I asked aloud, hmmm... another half inch, does that seem right? And "a" popped off a "half an inch? That sounds perfect mom.". LOL. Had almost forgotten he was watching movies with me and I really didn't expect an answer at all, let alone an answer from an 8 yr old who has no idea whether or not I need another half inch or not. But, yes. I agree. Another half inch is going to be just perfect. I should be able to get to the sleeve caps by the end of the week, which will get me to 33% a week before the end of the month. Which is great progress.

Pick Up Sweater #3- (expected to finish before end of month): I cast-on and knit both sleeves 2aat; when you reach the armpit, you stop knitting in the round and knit flat until the flat part from each sleeve reaches the middle of your back (looks a bit like s shrug at this point). You then graft (kitchener) the center line. Then from arm to arm along the back - you pick up and knit down the back for the length you want. Pattern calls for stockinette; and I saw two versions where they did a pair of cables down the center of the back. I chose to do a single, but slightly more complicated cable down the center of the back (loving it so far). I'm about four inches down the back panel (which is probably 8" total on the back). Once you finish the back - you turn around and pick up stitches along the side of the back; along the arm/neck and back down the other side and knit a garter stitch border. It's not exactly a "front" so to speak as much as a wide-open cardigan. And no seaming (which is pretty awesome). So, I'm going to call myself about 50% done. Its taking a bit longer than I expected to make this; but then again, I've also been working two sweaters at a time, so I would anticipate that's part of the issue.



Challenges:

I really wanted to make the Herbology sweater sleeves first so I could reassure myself that the pattern as written would fit (and it mostly does). The Pick Up Sweater is designed to be knit sleeves first. OMB, do I hate knitting sleeves. I'd get so frustrated and irritated for the sheer fact that they took me WEEKS to do. Which is really ridiculous because it's supposed to take that long.

Secondly, I feel like I'm getting next to nothing done. Which is also ridiculous. I'm getting a ton of knitting done. It's just that I'm so used to whipping out a half dozen hats in a couple of weeks. And these two sweaters seem to be taking forever. I have a couple of smaller projects to work on when I can't spend any more time on the sweaters; and they are starting to mount up as well. I was hoping that a) they would be portable so I could take them to cub scouts, doctor appointments, etc (and they are and have been great for that) and b) that working on them would help me feel like I'm finishing something (not working quite as well on this front). I have finished a charity hat and scarf (which will work as well for samples for class I'm teaching in March)... am working on a pair of super-fast gloves for myself... and a baby blanket for charity (a bit slow-go, but it's brainless). I should be able to look on my accomplishments with pride; but instead I just feel a bit "frustrated" that I don't have more to show for my efforts. Sigh. Here's hoping that I finish Pick it Up Sweater ASAP and that the February sweater goes faster so I'm less frustrated by slow progress.

Monday, January 9, 2012

Progress post

1) January 1, weave in the last of the ends on my Hooray Cardigan. (turn in for detention) DONE

2) Between January 1 & January 7th - one Brioche watch cap finished. (turn in for first class) DONE

3) Cast-on First sweater - Pick, Pick, Pick it Up pattern (to turn in before the end of January for a class) Cast-on; sleeves finished; getting going on the back

4) As soon as OWL is approved cast on for Cabled Sweater by Bernat - get it to the 40% finished mark and go back and keep working on Pick, Pick, Pick it up Pattern until it's done.Cast-on; sleeves at 12" - currently this is my priority; but can only manage an inch or two an evening before I need a bit of a break

5) Portable/simple project - work on a Brioche Scarf (third class project) - and take "as artsy as I can get them" photos for use to promote my Brioche knitting class. Cast-on; about eight inches complete

Tuesday, January 3, 2012

12 Sweaters in 2012

Sweater Number 1:

I started this in October, and set it aside within a few inches because I had a different knitting deadline that I was struggling with. Picked it up in December when my "other" deadline passed and just loved working on it. Had to set it aside a couple of times for projects for Christmas presents... but I sewed on the buttons on the First... and I love it.

The Hooray Cardigan: